C3M Construction and Infrastructure Projects.jpg

Location: Washington, DC Metro Region
Owner: Washington Metropolitan Area Transit Authority (WMATA)
Client: Washington Metropolitan Area Transit Authority (WMATA)
Year Completed: 2022
Sector: Rail & Mass Transit

Capabilities: 
▪︎ Traction Power Systems
▪︎ Communications Systems
▪︎ Electrical Systems
▪︎ Construction In Active Rail System


In conjunction with this contract to upgrade WMATA Traction Power Systems on the Red, Green, and Orange metro train lines in the Washington, DC area, C3M will install electrical equipment at five tie breaker stations and eleven traction power substations to accommodate the additional power capacity required for the 100% 8-Car Train and State of Good Repair programs. Clark Civil is part of the project and will be installing concrete pads in every location.

Awards

  • Washington Building Congress (WBC) - Craftsmanship Award for Electrical - Power Generation, Distribution and Switchgear - 2024