Location: Washington, DC
Owner: Washington Metropolitan Area Transit Authority (WMATA)
Client: W. M. Schlosser Co.
Year Completed: 2024
Sector: Rail & Mass Transit
Capabilities:
▪︎ Traction Power Systems
▪︎ Construction in active rail system
C3M is removing a 5,000-foot fiberglass conduit, 8,500 feet of feeder cables, and conduit hangers from the aerial structure where the Orange and Blue Lines meet to allow for structural repairs on the tracks’ bridges. The project team is then installing new conduits, hangers, and cable trays to the aerial structure to bring the tracks back online for service.